High West Energy

Expanding to meet the demands of a growing rural populace, High West Energy publicly solicited competitive bids for the construction of a pre-engineered metal building system.  The expansion houses their vehicle maintenance fleet along with materials for field installations along with new offices for both staff and public services.  RCI was awarded the contract for this project and assisted with several value engineered options after commencement.  The 14,625 square foot facility includes electric unit heaters in the vehicle shop area, mechanical ventilation system, trench drains, office finishes, and a ground source heat pump system for the office area.  RCI successfully finished this project within budget and on time per the contract documents.